United Kingdom: Burbo Bank Offshore Wind Farm
Print project overview | Back to project selector
1 of 4
Our client
The Burbo Offshore Wind Farm is situated on Burbo Flats in Liverpool Bay
Area approximately 8 km North West of Liverpool, at a water depth of 10-20 m. Mammoet
Van Oord was subcontractor to MT Hojgaard (foundations) and Siemens Windpower
(Wind Turbine Generators), who received the contract from SeaScape Energy.
Our work
The Burbo Bank Offshore Wind Farm contained 25 turbines, each capable of
producing a maximum expected power output of 3.6 Mw. Mammoet Van Oord has been
responsible for the load-out, marine transport and installation of 25
foundations and Wind Turbine Generators (WTG's).
In June
2006, the monopiles and transition pieces were transported on board of coasters
from Hoboken to the site were these coasters offloaded directly onto the
Jumping Jack. By the end of July 2006 a total of 25 foundations had been
successfully installed. Early May 2007, the Jumping Jack started with the
transportation and installation of 25 Siemens 3.6 Mw turbines. Within two
months all turbines were also successfully installed.
Our results
The
installation operations of the foundations and turbines were completed in time,
without incidents/accidents, to the total satisfaction of both main
contractors.
|
| Driver | Energy | | Discipline | Offshore | | Facts | Load-out, marine transport and installation of 25 foundations and WTG’s | | Client | MT Hojgaard (foundations) and Siemens Windpower (WTG’s) | | Country | United Kingdom | | Period | June - July 2006 and May - June 2007 | |
|
|